Last Updated 5.29.2025
ON-SITE LOCATION: EV Tech Area
Teams will be provided an energy meter to install after passing accumulator scrutineering. The proper function of the energy meter will be evaluated during the EV active scrutineering. EV teams must have an energy meter installed in the vehicle to compete in dynamic events.
Teams must provide energy meter data for each dynamic event. To download the energy meter the teams may download using the energy meter download station which will be located at each dynamic event or in the EV Tech Area. The energy meter download connector must be readily available to allow the data to be downloaded. Once downloaded the data will be made available to the team on the Live Results portal. Teams may choose to download their energy meter at any time but are encouraged to do so after each dynamic event.
The energy meter logs data anytime it has GLV power, and the TS voltage is greater than 50V. It is the team’s responsibility to manage the recording capacity of their energy meter by having it downloaded and cleared. Lack of data due to a full datalogger or failure to provide the required inputs to the energy meter will be treated as a violation.
Teams must associate the download data to dynamic event runs for all dynamic runs completed. If data is not associated it will be treated as missing data and a violation.